zeovit.com

zeovit.com (http://www.zeovit.com/forums/index.php)
-   Pumps / Plumbing / Sump / Design (http://www.zeovit.com/forums/forumdisplay.php?f=44)
-   -   Flow path question (http://www.zeovit.com/forums/showthread.php?t=36724)

Realworldreefing 11-12-2017 04:00 AM

Flow path question
 
So I was planning to use 2 Sicce SDC 7s in my build. 1 for return and the other to feed both the skimmer and the ZEO reactor. Now I'm wondering if its a bad idea. How much dosing components will I loose to the skimmer before ever making it to reactor? Opinions on this issue are welcome. Also I really need them both in same chamber due to space requirements, and I was hoping to only use 2 pumps in this build. Could I install some sort of sampling port before the reactor? Anything helps, Thanks

G.Alexander 11-13-2017 02:31 AM

Only workaround for the issue with the skimmer and the reactor in the same sump camber is a temporary stop of the skimmer while dosing.

G.Alexander


All times are GMT -5. The time now is 07:51 PM.

Powered by: vBulletin Version 3.8.7, Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Copyright by ZeoVit.com